Comparison of Key Results for Six Different Sequencing Projects
| Project | Actual minimum error rate (%) | Actual average error rate (%) | Length of <1% error region | Length of <5% error region | Average bases with P(error) <0.1% |
| A | 0.36 | 3.6 | 422 | 682 | 468 |
| B | 0.34 | 2.8 | 274 | 567 | 395 |
| C | 0.23 | 2.4 | 291 | 479 | 348 |
| D | 0.39 | 3.1 | 300 | 403 | 294 |
| E | 0.71 | 4.7 | 129 | 464 | 317 |
| F | 2.58 | 9.2 | 0 | 162 | 79 |